In 2010, within the Flame Towers project located in Baku, Azerbaijan, under Dia Holding, the works we successfully completed include:
• Gypsum board suspended ceilings
• Gypsum board partition walls
• Detailed gypsum board soffit works
• Plastering over exposed concrete surfaces
• Satin plaster finishing
• Surface preparation (ceiling and wall)
• Insulation applications on exposed concrete ceilings
• All types of bestboard works (ceiling and wall)
• All screed applications
• Floating floor systems
Approximate Quantities Executed: 92,500 m²
Main Contractor: Dia Holding